Phone : 847-309-2818 M-F 10am-5pm

BLOG

Keyword:

Startrac Bikes E-UB RB Drive Belt Alignment

Feb 24, 2023

Please check the attached document for Startrac E-Series, S-Series, and 8 series UB and RB Bikes Drive Belt Alignment ...

read more

Stairmaster Steppers 4400CL Alternator Replacement Procedures

Feb 24, 2023

1. Remove the bottom cover, Mark (by color) the location of each wire attached to the alternator. Remove the wires from the alternator. 2. Loosen and remove the alternator adjusting bolt on the slotted brace. Remove the Poly-V belt. Inspect the belt for wear and replace the belt if it is cracked, cut or is otherwise damaged. 3. Loosen and remove the nyloc nut from the alternator post. Remove...

read more

Stairmaster Steppers 4600 PT/CL Upper and Side Handles Removal and Replacement

Feb 08, 2023

Upper Handles (4600 PT/CL) 1. Disconnect the left and right contact heart rate cables from the back of the console.  2. Remove the two mounting screws from the top and bottom shield and remove the shields from the upper handle assembly. 3. Remove the four handrail adapter screws from the upper handle assembly. 4. Remove the upper handle assembly from the machine. The contact heart...

read more

Stairmaster Steppers 4400CL Cover Removal and Replacement

Feb 08, 2023

There are three covers on the 4400 PT/CL and the 4200 PT: the top cover, the mid-cover and the bottom cover. The top and bottom covers are made of a right and left section. Do not separate the right and left sections of either the top or bottom covers to perform most maintenance tasks. Access to the interior of the machine takes three steps: remove the mid cover, slide the top cover upward, and ...

read more

Stairmaster Steppers 4400CL Step Chain Removal and Replacement

Jan 30, 2023

1. Remove the bottom cover. 2. Remove the step chain retainers. 3. Support the pedal arm. Unhook the pedal arm spring from the spring hanger. Lift the step chain up and off the clutch spocket and lower the pedal arm to the floor. 4. Remove the double-pitch master link (PN 21298SV) and bearing sleeve assembly from the step chain connection point on the pedal arm. 5. Remove the master ...

read more

Concept2 Rower PM2 LCD Replace Instrux

Jan 08, 2023

There are two types of LCDs used in the PM2. The difference is the number of contact pads along the edges of the LCD. PN1416 has 43 contacts per side while PN1405 has 64 contacts per side. To determine which replacement type of LCD to use, check the number of black contact pads on the back (solder) side of the printed circuit board. This will require removing the printed circuit board from the PM2...

read more

Concept2 Rower C D Monitor Arm Adjustment

Jan 08, 2023

Please follow the pdf for Concept2 Rower C D Monitor Arm Adjustment - performance monitor arm tension adjustment...

read more

Concept2 Rower Shock Cord Replacement for Model C, D and E

Jan 08, 2023

Please check the pdf for Concept2 Rower Shock Cord Replacement for Model C, D and E...

read more

C D E Monorail Cleaning the Top

Jan 08, 2023

Cleaning Monorail Top Clean daily after use Tools Needed: Cloth Cleaner: soap & water or any glass cleaner...

read more

Concept2 Rower C D E Monorail Stainless Track Replacement

Jan 08, 2023

Please check the pdf for Concept2 Rower C D E Monorail Stainless Track Replacement for machine after 10-18-1994...

read more
  • 8